When installation is finishing, organise the product records and questions you want to discuss with the installer. A window installation handover is the point at which you confirm that what has been installed matches what was ordered, collect the written evidence you will need later, and record anything that still needs attention — before the crew leaves the site.
Matching installed windows to the agreed schedule
Your written quote or order schedule should describe each window individually — location, type, size, frame material, glass specification, hardware and any special requirements such as a bushfire attack level (BAL) rating or a child-fall-prevention restrictor. At handover, work through that schedule room by room.
For each opening, ask yourself whether the window type (casement, awning, sliding, double-hung, fixed, louvre) matches what was agreed. If the original quote included a specific glass specification — acoustic laminate, Low-E, or a named energy-performance requirement — the glass unit itself or its packaging label should confirm that specification. If you cannot read the label yourself, ask the installer to point it out.
The AGWA Guide to Residential Installation (Version 3, August 2019) says to follow manufacturer installation instructions and describes identification labels and compliance certificates. Its labelling extract includes certificate alternatives for timber housing windows and assemblies for other buildings, and provisions for incomplete assemblies. Ask the supplier which identification and compliance evidence applies to your actual assemblies; do not assume that every product must display the same label.
This is also the right moment to confirm that any child-fall-prevention restrictors are fitted to the openings required by your order. The AGWA Selection Guide checklist includes a prompt to confirm compliance with AS 5203 and NCC child fall prevention requirements for windows in relevant locations. Whether those requirements applied to your specific project, which openings they covered, and what form of compliance was required are project-specific questions — confirm the answers with your installer or building certifier rather than relying on any general description.
Collecting manuals and product identification
Written product documentation is easy to request at handover and difficult to track down afterwards. Ask for:
- Manufacturer’s installation or owner manual for each window system supplied. This will include the maker’s own cleaning and maintenance guidance, which is the authoritative reference for that specific product and any coatings it carries.
- Compliance certificate or statement of conformance to AS 2047, confirming the product’s wind-load rating (Serviceability Limit State, Ultimate Limit State) and water penetration resistance. The AGWA Guide to Residential Installation illustrates what a compliance certificate from an AWA Accreditation Program member looks like, including the builder/installer’s signed declaration that windows have been installed in the correct openings.
- WERS certificate, if energy performance ratings were part of your specification. AGWA’s guidance on WERS notes that you should keep your WERS certificate so that if you need to replace any broken glass or make any repairs you will know the specific make-up of the window or door.
- BAL compliance documentation, if your property is in a bushfire-prone area and the windows were specified to meet a BAL rating.
- Any product-specific warranty card or registration requirement. Warranty terms are set by the manufacturer, so ask what — if anything — needs to be lodged or retained to keep cover active.
Store these documents together, separate from the installation invoice. They are distinct: the invoice records a commercial transaction; the product documents record what was physically installed and its performance properties.
Questions for a model-specific operation demonstration
Manuals describe how a window should be operated, but the clearest instruction is a live demonstration on the actual installed unit. Before the installer leaves, ask them to show you — not just tell you — the following for any window type you haven’t used before:
- How to open, close and lock each operator type (handle direction, sequence of actions, any two-step lock mechanisms).
- Which manufacturer-approved owner functions preserve the required child-safety protection? Ask the installer to identify those functions in the actual owner guide; do not request a demonstration that disables fall protection.
- How to remove and refit fly screens or security screens if that is intended to be an owner task.
- Where the weep holes or drainage points are on sliding windows and doors, and what a blocked weep hole looks like — so you know when to call for service.
Do not rely on a generic YouTube video or a description of a similar product. The manufacturer’s instructions for your exact model govern; ask the qualified installer to demonstrate those steps on the day.
A hypothetical information-gap scenario
This is illustrative only, not a customer account.
Imagine a homeowner who accepts handover of eight replacement aluminium windows, receives a single-page invoice and assumes the glass specification can be confirmed later. Six months on, one pane develops a haze between the layers. The homeowner has not yet located the original WERS or compliance records and needs to ask what other supplier records or professional assessment can establish the installed specification. Which contact can supply the documents, assess the observed haze and explain the relevant product terms and available remedies? Missing paperwork alone does not determine whether the product matches the order or what rights apply.
The scenario illustrates the value of asking what product evidence is available and recording where to obtain it.
Recording unresolved items and the correct contact
If anything is not right at handover — a scratch on the glass, a sash that binds, a handle that does not engage cleanly, a flashing that looks incomplete — write it down in the presence of the installer and confirm the correct contact name, company name and phone number for follow-up. A text message to the installer that day, summarising what was noted and what was agreed, creates a simple timestamped record.
In South Australia, building work contractors must be licensed. The SA Government notes that individuals and businesses must be licensed as building contractors if they carry out or organise building work for others, and that a contractor’s licence can be limited to specific work such as aluminium window and door installation. If you have not already sighted the contractor’s licence details, you can verify them through the Consumer and Business Services licence register.
Keep unresolved item notes separate from your satisfaction with the overall job. Recording the observation and agreed follow-up helps you keep track of the concern; it does not itself determine any entitlement or remedy.
Keeping completion records separate from ongoing aftercare
Handover documentation — schedules, certificates, manuals, compliance statements — belongs in a permanent home file for the property. Aftercare reminders are different: ask which cleaning, inspection or other owner-care tasks the actual manufacturer recommends, and record the relevant intervals and instructions. Do not assume every hardware system needs lubrication.
Cleaning guidance in particular varies by glass coating and frame material. The correct approach for a standard clear float pane may differ from that for a Low-E-coated or tinted unit. Using the wrong product or technique on a coated surface can cause permanent damage. The manufacturer’s manual collected at handover is the right reference — not a generic cleaning guide, and not this article.
For the broader replacement process from quote through to installation day, see our guide to the window replacement process in Adelaide. If you want to understand the performance certificates that should accompany your windows, the WERS rating explained article covers what those numbers mean. For background on what goes into a quote schedule, see window quote schedule explained.
If you are yet to find an installer and would like a referral where one may be available, you are welcome to submit an enquiry.
Further reading
- AGWA Guide to Residential Installation, Version 3 (August 2019), hosted at southernstarwindows.com.au — handling, installation responsibilities, labelling and care guidance.
- AGWA Guide to Window and Door Selection — compliance checklist, labelling requirements under AS 2047 and WERS certification guidance. Available at agwa.com.au.
- AGWA / WERS: Energy Efficient Windows — keeping your WERS certificate for future glass replacement or repairs. agwa.com.au/WERS.
- SA Government — Building work contractor’s licence. sa.gov.au/topics/business-and-trade/licensing/building-and-trades/building-work-contractor-s-licence
- SA Government — Builder responsibilities. sa.gov.au/topics/business-and-trade/building-industry/planning-professionals/builder-responsibilities